Monitoring Aircraft Noise and Operations in the Vicinity of Airports: System Validation

Standard [CURRENT]

SAE ARP 4721/2:2006-08-28

Monitoring Aircraft Noise and Operations in the Vicinity of Airports: System Validation

Publication date
2006-08-28
Original language
English
Pages
60

177.20 EUR VAT included

165.61 EUR VAT excluded

Format and language options

PDF download
  • 177.20 EUR

Shipment (3-5 working days)
  • 177.20 EUR

Monitor with the Standards Ticker

This option is only available after login.
Easily subscribe: Save time and money now!

You can also subscribe to this document - together with other important standards in your industry. This makes your work easier and pays for itself after a short time.

Sparschwein_data
Subscription advantages
Sparschwein Vorteil 1_data

Important standards for your industry, regularly updated

Sparschwein Vorteil 2_data

Much cheaper than buying individually

Sparschwein Vorteil 3_data

Useful functions: Filters, version comparison and more

Publication date
2006-08-28
Original language
English
Pages
60

Quick delivery via download or delivery service

Buy securely with a credit card or pay upon receipt of invoice

All transactions are encrypted

Short description

This SAE Aerospace Recommended Practice (ARP) provides engineering methods that can be applied to monitoring aircraft noise and operations in the vicinity of airports using either attended or unattended monitoring systems, as well as methods for validation of measurement results from permanent systems. Part 1 provides guidance on the components, installation and administration of permanent systems and guidance on analysis of data collected from temporary monitoring of aircraft noise. Part 2, this part, describes both system screening tests and detailed test methods for validating the data reported by permanently installed systems. This document is intended as a guide toward standard practice and is subject to change with experience and technical advances. Potential users include: airport proprietors, airport neighbors, federal, state and local government agencies, equipment vendors and other public bodies and officials. Potential applications include: Part 1 - development of a basis for communication among concerned parties for acquisition, installation and operation of a permanent monitoring system, and reduction of sound level data collected through temporary monitoring; Part 2 - initial system testing and detailed system validation and improvement. The recommended practices included here are intended to apply to commercial air carrier airports and general-aviation airports. The guidance in Part 1 of this document is intended for application to airport noise-monitoring systems that are designed and installed (or refurbished) after the publication date of the document. Part 1 also provides methods for analyzing data from temporary noise monitoring. The methods and information in Part 2 may be used for any permanent monitoring system. The primary topics addressed in this Part 2 are identified in six subsections. Sections 2 and 3 give References and Definitions. Section 4, Post-Installation Screening Tests, identifies tests that may be conducted immediately after a system has been installed and is operational. These tests use only data directly from the system and should efficiently identify any major short-comings, such as missing significant numbers of operations, missing or erroneous aircraft noise event data. These tests may also be run at any time that some major portion or type of system reported data is in question. Section 5, System Validation for Special Studies, provides more rigorous and time consuming methods for quantifying a permanent system's capabilities when special needs require detailed, quantitative analysis of system data. It describes metrics, tests and calculations that can be used to determine how well the system is: (1) capturing all aircraft flight tracking information, (2) matching captured tracks to runways, aircraft types and flights, (3) capturing aircraft noise events, (4) matching those events with correct tracks, runways and aircraft, (5) measuring aircraft sound levels, and (6) properly locating aircraft flight tracks. Section 6 - Data Analysis and Reporting - Suggests what general steps can be taken to improve system operation and how measured data should be reported to provide sufficient information so that reviewers can easily judge data quality.
Loading recommended items...
Loading recommended items...
Loading recommended items...